This is a practical planning method for a proposed Kenyan gum lot. It does not establish available buyers, current prices or a permitted harvesting route.
Working Capital: fund the buying peak
Build a chronological cash schedule from collector payments, cleaning, bags, storage, testing, transport and buyer receipts. Enter initial cash that is actually available. Record financing only when its availability, conditions, due dates and costs are established. An expected loan or an unsigned buyer advance is not opening cash. Keep lender receipts and repayments visible in their correct periods.
For each period, closing cash equals opening cash plus receipts less outflows. The next period opens with that closing balance. The funding gap is the amount by which the closing balance falls below zero, and the peak gap is the largest of these deficits. The workbook requires complete periods, including evidenced zeros where nothing moves, so missing payments cannot disappear into an apparently affordable plan.
Compare the peak gap with committed funding and conditions before approving purchases. A positive order contribution can coexist with a cash shortfall well before the buyer pays. Move the receipt later and review the changed gap. Record who can authorise borrowing and what happens if finance is withdrawn. Do not promise collectors a payment date supported only by hoped-for buyer settlement. Reduce the buying round or wait when the required cash is unavailable.
Cost & Break-even: define the lot boundary
Cost one identified saleable lot and delivery obligation. Enter saleable kilograms, sale price and FX, then purchase, cleaning, packaging, testing, inland transport, freight, insurance, documentation, storage and other seller costs. Keep an itemised attachment for combined categories. Obtain an evidenced zero for a genuinely inapplicable cost; a blank category blocks the full contribution calculation.
Finance uses the principal actually funded, an annual simple rate, funded days and the lender's year-day convention. This is a planning calculation, not a replacement for the lender's repayment schedule. Add fees or compounding effects to the appropriate itemised cost when they apply, and avoid counting the same charge twice. Gross receipts less total seller cost gives contribution for this lot boundary, not annual business profit.
Break-even is total seller cost divided by saleable kilograms. Purchase kilograms and saleable kilograms differ when material is removed, rejected or sampled. Use actual measured recovery or a clearly identified user assumption with evidence rather than an invented yield. Reconcile the planned result after settlement using real costs and accepted quantity. Keep household withdrawals, business overhead outside the boundary and capital expenditure visible separately when deciding whether the broader operation is sustainable.
Downside Cases: price, rejection and late settlement
Enter an explicit price reduction, rejected fraction, additional delay, extra seller charges and affordable loss. The downside schedule uses the same costed lot. It reduces receipts for price and rejection while retaining incurred base costs, then adds simple finance for the extra delay and the extra charges entered. This makes the cost of a failed acceptance visible rather than silently shrinking all costs with revenue.
Choose stress assumptions from actual contract risks and the group's ability to absorb loss; the kit supplies no probability forecast. Check complete rejection, delayed payment and a loss allowance of zero as boundaries. Negative delay, negative charges and rejection above the whole lot are invalid. Missing base costing must keep the stress result at needs input.
The proportional pilot ceiling is a screening calculation based on the affordable share of the modelled loss. It assumes proportional scaling, so fixed tests, minimum transport charges and indivisible bags can invalidate it. Obtain new quotes for a smaller pilot before committing. The ceiling is not a safe quantity or approval. Review the cash schedule separately because extra delay can create an unaffordable funding gap even when the final stressed contribution remains positive.
Release meeting and printable decision record
Hold a release meeting before buying beyond the approved pilot or dispatching stock. Review material identity, permissions, collector agreements, intake records, quality checks, lot links, sample results, buyer acceptance terms, costing and cash. A green calculation cannot override an unresolved permission or a missing laboratory result required by the buyer. Record the decision as proceed, hold or decline, with reasons and a named approver.
Use a printable record with these fields: decision ID, lot ID, specification revision, evidence folder, open questions, responsible person, deadline, affordable loss, funding evidence and review date. Ask a second person to trace the key figures back to quotes and weigh records. List conditions that must be met before money or stock can move, and record who verifies each condition.
Preserve the signed or acknowledged decision alongside the workbook version used. If the buyer changes a price, the lot is blended or a permit response changes, reopen the decision rather than assuming the old approval survives. An unresolved gap should have an owner and action; do not replace it with reassuring prose. Members should be able to see both the opportunity being considered and the money at risk before agreeing to proceed.
Close the pilot and improve the next buying round
After settlement, reconcile purchased weight, accepted output, rejected stock, samples, remaining inventory, buyer receipts and all seller payments. Match bank and mobile-money references to ledger entries and investigate unmatched amounts. Explain differences between the original quote and realised receipt, including grading, weight, FX, deductions, timing and extra handling. Do not classify unpaid receivables as realised cash.
Review the full lot history with the collector group. Identify which failures came from missing evidence, which came from handling and which came from commercial terms. Keep disputed balances visible until resolved; a successful sale should not conceal an unpaid collector. Record changes to the next round's controls with an owner and implementation date.
Archive the clean master separately from completed transaction files. Preserve source documents, permission responses, quality records and corrected versions with access appropriate to their sensitivity and applicable retention requirements. Set a review date for current quotes and authority guidance. Expand only when the next lot has its own buyer terms, evidence and funding. One completed pilot is useful operating experience, not proof of unlimited demand, permanent prices or regulatory clearance for every future shipment.
Next step
Use the Kenya Gum Arabic & Natural Gums Aggregation Kit for the guide, sample and editable ten-tab workbook. Planned price KSh 999; availability depends on publication. No buyer introductions are included.
Research boundary: 27 October 2026. County collection licensing, access permissions and KEPHIS/NEMA applicability remain user-verified gaps.
Sources and evidence limits
- Exporter operating material and supply-disruption statement: Exporter reports around 70% supply disruption; independently unverified. Not a buyer offer. Potential-tonnage figures omitted from new kit claims.
- Moyale gums and resins workshop, 15-17 July 2025: Workshop observations on PDF pages 5 and 7: dated Marsabit price around KSh 700/kg and up to USD 100 shipping a 50 kg sample abroad for testing. Neither is a current quote; laboratory fee alone is not established. Uploaded March 2026.
- Access to finance in northern Kenya gum arabic trade: 26 May 2026 programme account reports an aggregator buying-cash constraint. Does not establish demand, credit access or rates for kit users.